• Log in
    View Item 
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Impact of Specification Changes on Chloride Induced Corrosion Service Life of Virginia Bridge Decks

    Thumbnail
    View/Open
    tjkthesis.pdf (775.8Kb)
    Downloads: 111
    Date
    2001-07-12
    Author
    Kirkpatrick, Trevor Joe
    Metadata
    Show full item record
    Abstract
    A model to determine the time to first repair and subsequent rehabilitation of concrete bridge decks exposed to chloride deicer salts that recognizes and incorporates the statistical nature of factors affecting the corrosion process is developed. The model expands on an existing deterministic model using statistical computing techniques, including resampling techniques such as the parametric and simple bootstrap. Emphasis was placed on the diffusion portion of the diffusion-cracking model, but advances can be readily included for the time for corrosion deterioration after corrosion initiation. Data collected from ten bridge decks built in Virginia between 1981 and 1994 was used to model the surface chloride concentration, apparent diffusion coefficient, and clear cover depth. Several ranges of the chloride corrosion initiation concentration, as determined from the available literature, were investigated. The time to first repair and subsequent rehabilitation predicted by the stochastic model is shorter than the time to first repair and subsequent rehabilitation predicted by the deterministic model, but is believed to more accurately reflect the true nature of bridge deck deterioration. The model was validated using historical service life data for 129 bridge decks built in Virginia between 1968 and 1972. The time to rehabilitation predicted for the set of bridge decks built between 1981 and 1994 by the stochastic model was approximately 13 years longer than the normalized time to rehabilitation projected for the bridge decks built between 1968 and 1972 using historical data. The increase in time to rehabilitation for the newer set of bridge decks was attributed to a reduction in the specified maximum water/cement ratio and increase in clear cover depth.
    URI
    http://hdl.handle.net/10919/34056
    Collections
    • Masters Theses [17908]

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us
     

     

    VTechWorks

    AboutPoliciesHelp

    Browse

    All of VTechWorksCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Log inRegister

    Statistics

    View Usage Statistics

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us