Virginia Tech
    • Log in
    View Item 
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A methodology that integrates the scheduling of job sequencing and AGV dispatching in a FMS

    Thumbnail
    View/Open
    LD5655.V855_1992.H354.pdf (4.691Mb)
    Downloads: 105
    Date
    1992-07-07
    Author
    Hamilton, Wade W.
    Metadata
    Show full item record
    Abstract
    A Flexible Manufacturing System (FMS) is an integrated system consisting of several automated work centers interconnected by an automated material handling system. An integrated scheduling methodology is required to schedule all FMS sub-systems. The overall objective of this research was to develop a scheduling methodology to integrate job sequencing and Automatic Guided Vehicle System dispatching within a FMS environment.

    To develop the new scheduling methodology, the currently used AGVS controller decision set was examined and expanded. The expanded decision set gives the AGVS controller more options to choose from when scheduling the AGVS.

    The developed integrated scheduling methodology contains four steps. The first step determines which job is to be processed next by each work center based on job sequencing heuristics. The second step determines which work center is to be serviced next by the AGVS based on the estimated time till the work center is forced to stop production. The third step determines which specific job is to be serviced next by the AGVS by combining the work centers' processing orders and the work center servicing priorities. The fourth step decides which AGV is to transport the job requiring immediate service.

    Based on the preliminary study of a fictitious FMS, the new scheduling methodology showed a statistically significant increase in total job throughput, and a significant decrease in average flow time. Work center utilization also increased. A slight increase in unloaded AGV travel time was found, but was outweighed by the other benefits.

    URI
    http://hdl.handle.net/10919/34919
    Collections
    • Masters Theses [19413]

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us
     

     

    VTechWorks

    AboutPoliciesHelp

    Browse

    All of VTechWorksCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Log inRegister

    Statistics

    View Usage Statistics

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us