Synchrophasor Based Centralized Remote Synchroscope for Power System Restoration

Files
TR Number
Date
2018
Journal Title
Journal ISSN
Volume Title
Publisher
Virginia Tech
Abstract

The process of Synchronization between two buses in a power system plays a vital role, especially during blackstart or bulk power system restoration period. The synchronization process is primarily monitored in the presence of experienced personnel at the substation level, which might not control or even predict the after effects of synchronization as soon as the synchronizing breaker between the two buses respective to the two islands is closed. However, with the advent of phasor measurement units (PMUs) providing time synchronized synchrophasor data, synchroscope functionality can now be implemented at a centralized remote control platform, usually the control room of the specific utility. This thesis presents a technique along with the actual implementation of such a PMU Synchroscope analytic developed as a part of the Department of Energy sponsored open and Extensible Control and Analytics platform for synchrophasor data (openECA project). The challenges faced to realize this functionality at the centralized remote location along with methods to overcome these hurdles have been discussed in the document. Additional features in comparison to the conventional synchroscope device are also added to facilitate a smoother and successful synchronization, reducing error on behalf of the user /operator and thus, facilitating a faster power system restoration.

Description
Keywords
Phasor Data Concentrators, Synchrophasors, Synchroscope, Voltage Sensitivities
Citation
Collections