Hybrid flow shop scheduling with prescription constraints on jobs

TR Number

Date

2003-12-05

Journal Title

Journal ISSN

Volume Title

Publisher

Virginia Tech

Abstract

The sponsor of the thesis is the Composite Unit of AIRBUS Nantes plant, which manufactures aircraft composite. The basic process to manufacture composite parts is to lay-up raw composite material on a tool and involves very costly means and raw material.

This process can be modeled as a two-stage hybrid flow shop problem with specific constraints, particularly prescription constraints on the jobs.

This thesis restates the practical problem as a scheduling problem by doing hypotheses and restrictions. Then, it designs a mathematical model based on time-indexed variables. This model has been implemented in an IP solver to solve real based scenarios. A heuristic algorithm is developed for obtaining good solutions quickly. Finally, the heuristic is used to increase the execution speed of the IP solver. This thesis concludes by a discussion on the advantages and disadvantages of each option (IP solver vs. heuristic software) for the sponsor.

Description

Keywords

Aerospace Industry, Heuristic Software, Optimization, Integer Programming Software, Prescription Constraints, Two-stage Hybrid Flow Shop

Citation

Collections