Efficient Resource Development in Electric Utilities Planning Under Uncertainty

dc.contributor.authorMaricar, Noor M.en
dc.contributor.committeechairRahman, Saifuren
dc.contributor.committeememberGodrej, Adil N.en
dc.contributor.committeememberKrimgold, Fredericken
dc.contributor.committeememberMidkiff, Scott F.en
dc.contributor.committeememberLiu, Yiluen
dc.contributor.departmentElectrical and Computer Engineeringen
dc.date.accessioned2011-08-22T19:08:27Zen
dc.date.adate2004-10-05en
dc.date.available2011-08-22T19:08:27Zen
dc.date.issued2004-09-07en
dc.date.rdate2004-10-05en
dc.date.sdate2004-09-14en
dc.description.abstractThe thesis aims to introduce an efficient resource development strategy in electric utility long term planning under uncertainty considerations. In recent years, electric utilities have recognized the concepts of robustness, flexibility, and risk exposure, to be considered in their resource development strategy. The concept of robustness means to develop resource plans that can perform well for most, if not all futures, while flexibility is to allow inexpensive changes to be made if the future conditions deviate from the base assumptions. A risk exposure concept is used to quantify the risk hazards in planning alternatives for different kinds of future conditions. This study focuses on two technical issues identified to be important to the process of efficient resource development: decision-making analysis considering robustness and flexibility, and decision-making analysis considering risk exposure. The technique combines probabilistic methods and tradeoff analysis, thereby producing a decision set analysis concept to determine robustness that includes flexibility measures. In addition, risk impact analysis is incorporated to identify the risk exposure in planning alternatives. Contributions of the work are summarized as follows. First, an efficient resource development framework for planning under uncertainty is developed that combines features of utility function, tradeoff analysis, and the analytical hierarchy process, incorporating a performance evaluation approach. Second, the multi-attribute risk-impact analysis method is investigated to handle the risk hazards exposed in power system resource planning. Third, the penetration levels of wind and photovoltaic generation technologies into the total generation system mix, with their constraints, are determined using the decision-making model. The results from two case studies show the benefits of the proposed framework by offering the decision makers various options for lower cost, lower emission, better reliability, and higher efficiency plans.en
dc.description.degreePh. D.en
dc.format.mediumETDen
dc.identifier.otheretd-09142004-235255en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-09142004-235255en
dc.identifier.urihttp://hdl.handle.net/10919/11258en
dc.publisherVirginia Techen
dc.relation.haspartNM_Thesis_Final.pdfen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectDecision Makingen
dc.subjectFlexibilityen
dc.subjectDecision Support Systemen
dc.subjectElectric Utilities Power Generationen
dc.subjectPower System Planningen
dc.subjectStrategic Planningen
dc.subjectRisk Exposureen
dc.subjectRobustnessen
dc.titleEfficient Resource Development in Electric Utilities Planning Under Uncertaintyen
dc.typeDissertationen
thesis.degree.disciplineElectrical and Computer Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en