Anderson, Victor Fontaine2014-03-142014-03-141953-06-03etd-04262010-020152http://hdl.handle.net/10919/42261Through this thesis evidence will be collected to determine the need of a proposed turbo-generator and boiler unit adequate for future requirements of the campus and community of Blacksburg.124 leavesBTDapplication/pdfenIn CopyrightLD5655.V855 1953.A644Steam-turbines -- TestingAn economic study of a proposed high-pressure boiler and turbo-generator unit in the central heating and power plant of the Virginia Polytechnic InstituteThesishttp://scholar.lib.vt.edu/theses/available/etd-04262010-020152/