Development and Implementation of a 10-year Plan to Manage Interstate Pavements in NC

dc.contributorVirginia Tech Transportation Instituteen
dc.contributorNorth Carolina. Department of Transportation. Pavement Management Uniten
dc.contributorCorley-Lay, Judithen
dc.contributor.authorCorley-Lay, Judithen
dc.date.accessed2015-07-07en
dc.date.accessioned2015-08-11T18:46:19Zen
dc.date.available2015-08-11T18:46:19Zen
dc.date.issued2015-06-04en
dc.description.abstractA 10-Year plan was developed to manage preservation, minor and major rehabilitation of the Interstate Highway System in North Carolina. The guidance given in the development of the plan was a budget of $100 million per year and applying some treatment to each segment sometime in the 10 year period. The $100 million per year resulted from analyses using the Pavement Management System (PMS) on the cost to meet and maintain our performance goals for interstate pavements. Without a plan, the funding for interstate maintenance was diverted to other needs, resulting in competition for very limited funding and many deferred needs. The plan was developed using the Pavement Management System construction history, the performance histories of many treatments, the Pavement Condition Survey results and known pavement needs. Because of the planned approach, the 10-year plan includes preservation treatments as well as light and moderate rehabilitation treatments. Treatments ranged from crack sealing to a five inch asphalt overlay. The draft plan resulted in meeting both targets: $100 million per year and touching every segment at least once. Following the submission of the draft plan, $10 million per year was set aside for bridge deck repairs and an additional $5 million per year was assigned to other interstate needs. The result of these reductions was a plan that extends beyond 10 years in order to treat every segment at least once. Five years of the plan have been converted into projects and the first 2 years have been programmed. The plan demonstrates the importance of dependable and consistent funding in maintaining a high level of service.en
dc.description.notesPresented during Session 23: Pavement Maintenance Management and Applied PMS, moderated by Rada Gonzalo, at the 9th International Conference on Managing Pavement Assets (ICMPA9) in Alexandria, VAen
dc.description.notesIncludes conference paper and PowerPoint slides.en
dc.format.extent15 pagesen
dc.format.mimetypeapplication/pdfen
dc.identifier.citationCorley-Lay, J. (2015, June). Development and implementation of a 10-year plan to manage interstate pavements in NC. Paper presented at the 9th International Conference on Managing Pavement Assets, Alexandria, VA. Presentation retrieved from www.apps.vtti.vt.edu/PDFs/icmpa9/session23/Corley-Lay.pdfen
dc.identifier.urihttp://hdl.handle.net/10919/56369en
dc.identifier.urlwww.apps.vtti.vt.edu/PDFs/icmpa9/session23/Corley-Lay.pdfen
dc.language.isoen_USen
dc.relation.ispartof9th International Conference on Managing Pavement Assetsen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectInterstate systemen
dc.subjectMaintenanceen
dc.subjectPavement preservationen
dc.subjectLong term pavement planen
dc.titleDevelopment and Implementation of a 10-year Plan to Manage Interstate Pavements in NCen
dc.title.alternativeDevelopment of a 10-year Plan for Interstate Highways in NCen
dc.typePresentationen
dc.type.dcmitypeTexten

Files

Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Corley-Lay.pdf
Size:
203.66 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
ICMPA9-000027.PDF
Size:
233.7 KB
Format:
Adobe Portable Document Format