Project 10 Image - NC Buncombe County - 1935-01-01
Files
TR Number
Date
1935-01-01
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Virginia Tech
Abstract
V-notch weir and stand pipe/house for measuring stage. Likely downstream from previous subsurface collection system. Gauging Station #8. Wenz farm. Flow not continuous. Installed 1934. Bent Creek Experimental Forest.
Description
Keywords
Applied Science, Agriculture, Virginia Extension - Project 10, Agricultural Engineering, Runoff Rates, Water Runoff, Soil and Water Conservation