Abstract

Number 1 irrigation plot. Check board in background. Just prior to fourth cutting. Irrigated August 8-9 1.4 inches, August 14-15 1.4 inches, August 27-29 1.4 inches, September 9-10 1.4 inches, total 5.6 inches. Precipitation approximately 0.90 inch.

Description

Keywords

Applied Science, Agriculture, Virginia Extension - Project 10, Surface Irrigation, Irrigation, Soil and Water Conservation, Applied Science, Agriculture, Agricultural Engineering, Virginia Extension - Project 10, Surface Irrigation, Irrigation, Soil and Water Conservation