The use of portfolio management with target costed process oriented products under conditions of uncertainty

dc.contributor.authorHorton, Kevin G.en
dc.contributor.committeechairSullivan, William G.en
dc.contributor.committeememberBlanchard, Benjamin S. Jr.en
dc.contributor.committeememberReasor, Roderick J.en
dc.contributor.departmentSystems Engineeringen
dc.date.accessioned2014-03-14T21:28:21Zen
dc.date.adate2010-02-02en
dc.date.available2014-03-14T21:28:21Zen
dc.date.issued1995-08-05en
dc.date.rdate2010-02-02en
dc.date.sdate2010-02-02en
dc.description.abstractThe present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product costs during the design phases of the product life. One of the many cost management tools that are presently in use is target costing. An iterative process, target costing attempts to reduce the cost of manufacturing products by using value engineering techniques so that identified target costs can be realized. As a step improvement program, the ability of a company to obtain its target cost in not always certain. Target profits from individual products are grouped together into portfolios and then managed according to company strategic profit plans. This report investigates methods used for identifying the uncertainties that can exist in the target costing process and suggests the potential use efficient portfolio techniques for the management of process oriented or continuous products. The report also suggests a number of follow-on projects that could encompass the use of specific decision support systems for the examination of both target costing uncertainties and portfolio management.en
dc.description.degreeMaster of Scienceen
dc.format.extentx, 119 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-02022010-020227en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-02022010-020227/en
dc.identifier.urihttp://hdl.handle.net/10919/40902en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V851_1995.H678.pdfen
dc.relation.isformatofOCLC# 34462222en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectefficient portfoliosen
dc.subjectquadratic programmingen
dc.subjectcontinuous productsen
dc.subjecttarget costingen
dc.subject.lccLD5655.V851 1995.H678en
dc.titleThe use of portfolio management with target costed process oriented products under conditions of uncertaintyen
dc.typeMaster's projecten
dc.type.dcmitypeTexten
thesis.degree.disciplineSystems Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V851_1995.H678.pdf
Size:
4.7 MB
Format:
Adobe Portable Document Format