COTS selection criteria in government programs

dc.contributor.authorReintjes, Ericen
dc.contributor.departmentSystems Engineeringen
dc.date.accessioned2014-03-14T21:27:52Zen
dc.date.adate2010-01-26en
dc.date.available2014-03-14T21:27:52Zen
dc.date.issued1995en
dc.date.rdate2010-01-26en
dc.date.sdate2010-01-26en
dc.description.abstractThe process involving the design and acquisition of systems for the Government sector has recently shifted its emphasis from mostly custom designed equipment to the extensive use of Commercial-Off-The-Shelf (COTS) hardware and software. Because the relative merits of custom or COTS are not clearly understood by the design engineers, the correct parameters and criteria are not always properly identified. This study investigated the decision criteria for the selection of COTS vice custom designed systems, assemblies and components in the design phases of the system life-cycle. Since Government requirements differ from those of commercial customers, selection was considered from the perspective of the Government customer. The operational conditions pertinent to the Government environment were used to determine the relevant criteria in the selection of the system components. The parameters selected and evaluated were life-cycle cost, effectiveness, unit data, system support and supplier rating. Subcategories included items such as standardized fit, existing field population, established design, reliability, source of reliability data, software interfaces, and cost. Other considerations such as maturity of technology and rate of technological change were also discussed. A definition or description of each selection criterion, as well as the validity of that measure were examined. Trade-offs and weighting factors to select the best solution were also recommended.en
dc.description.degreeMaster of Scienceen
dc.format.extentiv, 68 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-01262010-020208en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-01262010-020208/en
dc.identifier.urihttp://hdl.handle.net/10919/40793en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V851_1995.R456.pdfen
dc.relation.isformatofOCLC# 34431225en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectlife-cycleen
dc.subjectrequirementsen
dc.subjectdesignen
dc.subject.lccLD5655.V851 1995.R456en
dc.titleCOTS selection criteria in government programsen
dc.typeMaster's projecten
dc.type.dcmitypeTexten
thesis.degree.disciplineSystems Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V851_1995.R456.pdf
Size:
4.96 MB
Format:
Adobe Portable Document Format
Description: