Virginia's Stormwater Impact Evaluation: Developing an Optimization Tool for Improved Site Development, Selection and Placement of Stormwater Runoff BMPs

dc.contributor.authorYoung, Kevin D.en
dc.contributor.authorYounos, Tamim M.en
dc.contributor.authorDymond, Randel L.en
dc.contributor.authorKibler, David F.en
dc.contributor.departmentVirginia Water Resources Research Centeren
dc.coverage.countryUnited Statesen
dc.coverage.stateVirginiaen
dc.date.accessed2014-03-18en
dc.date.accessioned2014-07-10T16:16:34Zen
dc.date.available2014-07-10T16:16:34Zen
dc.date.issued2009-01en
dc.description.abstractSince the early 1970’s, the most common approach to stormwater management in the United States has been to drain runoff from a developed site as quickly and efficiently as possible, and then detain this runoff and release it to a downstream receiving channel at a controlled rate. Without question, the most popular means by which this management approach occurs is through the use of dry detention basins. In 2007, The Congressional Research Service reported that up to 50 percent of water pollution problems in the United States are attributed to urban stormwater runoff (CRS, 2007). Pollutants washed off of roads, parking lots, and other surfaces include nutrients, hydrocarbons, pesticides, heavy metals, bacteria, as well as larger debris. Stormwater runoff entering a conventional dry detention basin typically does not experience a hydraulic residence time of adequate duration to provide significant gravitational settling of suspended pollutants.en
dc.format.extent219 pagesen
dc.format.mimetypeapplication/pdfen
dc.identifier.urihttp://hdl.handle.net/10919/49491en
dc.identifier.urlhttp://vwrrc.vt.edu/pdfs/specialreports/SR-44%20USEPA%20BMP%20Optimization%20Project%20Final%20Report.pdfen
dc.language.isoen_USen
dc.publisherVirginia Water Resources Research Centeren
dc.relation.ispartofseriesVWRRC Special Report ; no. SR44-2009en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccTC1.V5en
dc.subject.lcshWater supply -- Virginiaen
dc.subject.lcshWater quality -- Virginiaen
dc.subject.lcshWater resources development -- Virginiaen
dc.titleVirginia's Stormwater Impact Evaluation: Developing an Optimization Tool for Improved Site Development, Selection and Placement of Stormwater Runoff BMPsen
dc.typeReporten
dc.type.dcmitypeTexten

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
VWRRC_sr200944.pdf
Size:
3.42 MB
Format:
Adobe Portable Document Format