VTechWorks staff will be away for the winter holidays starting Tuesday, December 24, 2024, through Wednesday, January 1, 2025, and will not be replying to requests during this time. Thank you for your patience, and happy holidays!
 

High Performance Case Study: R.D. and Euzelle P. Smith Middle School Architect’s Statement Site Shading Environmental Systems Learning Technology Architecture Design Constraints

TR Number

Date

2011

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Virginia Tech. Center for High Performance Environments

Abstract

Open plan of the building and day lighting conditions are the initial emphasis. In a typical classroom with the light monitors located in the center, meter readings averaged approximately 55fcs. Interior light sensors keep the classrooms at a balance point by automating the overhead fluorescent lighting. Motion sensors turn off the lights when rooms are not occupied. Shading strategies include aluminum shielded light shelves and angled reflectors on the exterior niche of each concave window location. Design strategies include rain water reclamation and some active solar panels. Storm water runoff collected from the roof to an exterior niche of each concave window location. Design strategies include rain water reclamation and some active solar panels. Storm water runoff collected from the roof to an exterior underground tank to be filtered and used for sinks and water closets. Active solar collectors are strategically placed on some of the light monitors. Solar tubes are used for reclamation of hot water for hand washing use in the cafeteria. Photovoltaic collectors activate the night lighting system at the exterior porticos.

Description

Keywords

Citation