Composite action in a steel girder span with precast deck panels :the I-81 bridge over the New River in Radford, Virginia

dc.contributorVirginia Transportation Research Councilen
dc.contributorVirginia Techen
dc.contributor.authorCousins, Thomas E.en
dc.contributor.departmentCivil and Environmental Engineeringen
dc.date.accessed2013-11-21en
dc.date.accessioned2014-03-19T18:30:20Zen
dc.date.available2014-03-19T18:30:20Zen
dc.date.issued2003-10-01en
dc.description.abstractTwo parallel bridges carry I-81 north and south over the New River in southwest Virginia, near the city of Radford. The bridges are identical in design and have been in place since 1985. In recent years, a number of maintenance issues have been reported, primarily related to cracking of the cast-in-place topping over partial-depth precast deck panels. A study was undertaken to determine the influence of the observed deterioration on the structural capacity of the affected bridge spans. The analysis indicated that the full potential of the composite slab-girder system is no longer being realized. Continued deterioration of the deck is likely, especially given the frequency of heavy truck traffic on this structure and the inherent vibration. It appears that the presence of precast cast-in-place deck sections has reduced the overall stiffness of the deck as compared to the original design. The movement, in conjunction with a poor deck panel support detail, is likely to cause a continual maintenance problem, as additional precast panels begin to move and fracture of the cast-in-place topping occurs. As a potential mitigation option, replacement of the fiber bolster material between the top flange of the girders and the precast panels with more rigid steel shims and/or concrete is recommended to increase the bearing surface of the panels, reduce vertical displacement of panel edges, and minimize dynamic impact at the joints.en
dc.description.sponsorshipVirginia Department of Transportationen
dc.format.extent20 pagesen
dc.format.mimetypeapplication/pdfen
dc.identifier.citationMichael C. Brown, Ph.D., P.E, Jose P. Gomez, Ph.D., P.E, Thomas E. Cousins, Ph.D., P.E., Furman W. Barton, Ph.D., P.E. "Composite Action in a Steel Girder Span with Precast Deck Panels: the I-81 Bridge Over the New River in Radford, Virginia," Virginia Transportation Research Council 530 Edgemont Road Charlottesville, VA 22903, Report No. VTRC 04-R4, Oct. 2003.en
dc.identifier.govdocVTRC 04-R4en
dc.identifier.urihttp://hdl.handle.net/10919/46704en
dc.identifier.urlhttp://www.virginiadot.org/vtrc/main/online_reports/pdf/04-r4.pdfen
dc.language.isoen_USen
dc.publisherVirginia Center for Transportation Innovation and Researchen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.titleComposite action in a steel girder span with precast deck panels :the I-81 bridge over the New River in Radford, Virginiaen
dc.typeTechnical reporten
dc.type.dcmitypeTexten

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
04-r4.pdf
Size:
1.25 MB
Format:
Adobe Portable Document Format
Description:
Technical Report