VTechWorks staff will be away for the winter holidays until January 5, 2026, and will respond to requests at that time.
 

Project 10 Image - VA Floyd - post 1959

TR Number

Date

1959, post

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Virginia Tech

Abstract

Brush Creek W-I after installation of low flow control (weir). It was install in May 1959, so this is after that.

Description

Keywords

Applied Science, Agricultural Engineering, Agriculture, Virginia Extension - Project 10, Runoff Rates, Water Runoff, Soil and Water Conservation

Citation