VTechWorks staff will be away for the winter holidays starting Tuesday, December 24, 2024, through Wednesday, January 1, 2025, and will not be replying to requests during this time. Thank you for your patience, and happy holidays!
 

Investigation, Analysis, and Modeling of Longwall Face-to-Face Transfers

dc.contributor.authorPatrick, William Charlesen
dc.contributor.committeechairTopuz, Ertugrulen
dc.contributor.committeememberLineberry, G. T.en
dc.contributor.committeememberKarfakis, Mario G.en
dc.contributor.committeememberLucas, J. Richarden
dc.contributor.committeememberKarmis, Michael E.en
dc.contributor.committeememberBalci, Oomanen
dc.contributor.departmentMining and Minerals Engineeringen
dc.date.accessioned2014-03-14T21:14:58Zen
dc.date.adate2008-06-09en
dc.date.available2014-03-14T21:14:58Zen
dc.date.issued1993en
dc.date.rdate2008-06-09en
dc.date.sdate2008-06-09en
dc.description.abstractThis dissertation reports on research efforts to investigate, analyze, and model longwall face-to-face transfers through the use of operations research techniques. The purpose is to reduce overall transfer time and the variation of transfer times among operations within the U. S. longwall industry. The research includes: (1) investigation of existing longwall transfers to determine standard and variant procedures; (2) development of comprehensive activity sequence models of existing longwall transfers; (3) generation of a simulation model for longwall transfers in various geological and mining conditions; and, (4) investigation of the economic feasibility of time-cost tradeoffs in the transfer procedure. Face transfer field data were collected from three eastern U.S. mining operations. From these data, general operational characteristics, transfer personnel utilization, and transfer procedures are described. A comparison of methods provide a breakdown of transfer activities, identify critical activities, and establish the state-of-the-art in transfer technology. Project scheduling models are developed for each operation using precedence networking analytical techniques and are applied through a computerized commercial software package. The project scheduling models accurately represent each of the operations' transfer procedures and provide information on the criticality of transfer activities and estimated project duration. Simulation models are developed, using Monte Carlo techniques, to combine analytical project scheduling with probability-based transfer activity durations. The simulation models closely match the results of the project scheduling models and provide information on the statistical tendencies of critical activities, paths, and project durations. The economic feasibility of reducing transfer time is analytically evaluated by collapsing critical activities and attempting an alternative roof control method. When compared to the lost production potential of longwall mining systems, the two time-cost trade-off procedures are proven, by the transfer simulation model, to be economically viable. This research is expected to contribute to the longwall mining industry by offering an objective approach that can be used in the prediction, planning, preparation, and implementation of longwall face equipment transfers.en
dc.description.degreePh. D.en
dc.format.extentix, 275 leavesen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-06092008-112841en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-06092008-112841/en
dc.identifier.urihttp://hdl.handle.net/10919/38588en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V856_1993.P376_drw03.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw04.pdfen
dc.relation.haspartLD5655.V856_1993.P376.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw02.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw05.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw08.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw07.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw01.pdfen
dc.relation.haspartLD5655.V856_1993.P376_drw06.pdfen
dc.relation.isformatofOCLC# 30505704en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectsimulation modelsen
dc.subjectMonte Carlo techniquesen
dc.subject.lccLD5655.V856 1993.P376en
dc.subject.lcshLongwall mining -- Analysisen
dc.subject.lcshLongwall mining -- Modelsen
dc.subject.lcshOperations researchen
dc.titleInvestigation, Analysis, and Modeling of Longwall Face-to-Face Transfersen
dc.typeDissertationen
dc.type.dcmitypeTexten
thesis.degree.disciplineMining and Minerals Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en

Files

Original bundle
Now showing 1 - 5 of 9
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.P376.pdf
Size:
13.07 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.P376_drw01.pdf
Size:
6.15 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.P376_drw02.pdf
Size:
7.14 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.P376_drw03.pdf
Size:
5.85 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.P376_drw04.pdf
Size:
6.48 MB
Format:
Adobe Portable Document Format