VTechWorks staff will be away for the winter holidays starting Tuesday, December 24, 2024, through Wednesday, January 1, 2025, and will not be replying to requests during this time. Thank you for your patience, and happy holidays!
 

WAMS-based Intelligent Load Shedding Scheme for Preventing Cascading Blackouts

dc.contributor.authorVeda, Santosh Sambamoorthyen
dc.contributor.committeechairThorp, James S.en
dc.contributor.committeechairPhadke, Arun G.en
dc.contributor.committeememberDe La Ree, Jaimeen
dc.contributor.committeememberPierson, Mark Alanen
dc.contributor.committeememberShukla, Sandeep K.en
dc.contributor.committeememberCenteno, Virgilio A.en
dc.contributor.departmentElectrical and Computer Engineeringen
dc.date.accessioned2013-02-19T22:40:47Zen
dc.date.available2013-02-19T22:40:47Zen
dc.date.issued2013-01-07en
dc.description.abstractSevere disturbances in a large electrical interconnection cause a large mismatch in generation and load in the network, leading to frequency instability. If the mismatch is not rectified quickly, the system may disintegrate into multiple islands. Though the Automatic Generation Controls (AGC) perform well in correcting frequency deviation over a period of minutes, they are ineffective during a rolling blackout. While traditional Under Frequency Load Shedding Schemes (UFLS) perform quick control actions to arrest frequency decline in an islanded network, they are not designed to prevent unplanned islanding. The proposed Intelligent Load Shedding algorithm combines the effectiveness of AGC Scheme by observing tie line flows and the speed of operation of the UFLS Scheme by shedding loads intelligently, to preserve system integrity in the event of an evolving cascading failure. The proposed scheme detects and estimates the size of an event by monitoring the tie lines of a control area using Wide Area Measurement Systems (WAMS) and initiates load shedding by removing loads whose locations are optimally determined by a sensitivity analysis. The amount and location of the load shedding depends on the location and size of the initiating event, making the proposed algorithm adaptive and selective. Case Studies have been presented to show that control actions of the proposed scheme can directly mitigate a cascading blackout.en
dc.description.degreePh. D.en
dc.format.mediumETDen
dc.identifier.othervt_gsexam:111en
dc.identifier.urihttp://hdl.handle.net/10919/19251en
dc.publisherVirginia Techen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectIntelligent Load Shedding(ILS)en
dc.subjectWide Area Measurement System (WAMS)en
dc.subjectSmart Gridsen
dc.subjectUnder Frequency Load Shedding (UFLS)en
dc.subjectblackouten
dc.titleWAMS-based Intelligent Load Shedding Scheme for Preventing Cascading Blackoutsen
dc.typeDissertationen
thesis.degree.disciplineElectrical Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Veda_SS_D_2013.pdf
Size:
1.78 MB
Format:
Adobe Portable Document Format