Task based performance feedback and subsequent worker performance

dc.contributor.authorHall, Margery J.en
dc.contributor.committeechairHauenstein, Neil M. A.en
dc.contributor.committeememberFoti, Roseanne J.en
dc.contributor.committeememberJohnson, Ronald D.en
dc.contributor.committeememberHarvey, Robert J.en
dc.contributor.committeememberHinkle, Dennis E.en
dc.contributor.departmentPsychologyen
dc.date.accessioned2014-03-14T21:18:16Zen
dc.date.adate2008-08-25en
dc.date.available2014-03-14T21:18:16Zen
dc.date.issued1990-03-05en
dc.date.rdate2008-08-25en
dc.date.sdate2008-08-25en
dc.description.abstractRecent task based performance feedback research has concentrated on investigation of the effects of feedback message characteristics to explain variance in individual's post feedback predicted performances. Results of this research have not been well integrated within existing performance feedback models. The present study was conducted to assess the differential effects of feedback message content and feedback message characteristics on real subsequent task performance. Results of the present study indicate that feedback message content, not characteristics, is the critical factor in improving subsequent performance. However, the subject's perception of certain feedback message characteristics is important in influencing subsequent performance via the subject's overall perception/acceptance of the feedback message (Ilgen, et al., 1979). Results also indicate that an additional 5% of the variance in subsequent performance can be explained by incorporating a measure of Locke, et al.'s (1981)goa1 setting into the desire/intention to respond to feedback components of the Ilgen, et a1. feedback model, when subjects are asked to articulate their behavioral plans for future task performance. Results are discussed within the framework of current feedback models and future research needs.en
dc.description.degreePh. D.en
dc.format.extentx, 174 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-08252008-162924en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-08252008-162924/en
dc.identifier.urihttp://hdl.handle.net/10919/39254en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V856_1990.H343.pdfen
dc.relation.isformatofOCLC# 23101497en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V856 1990.H343en
dc.subject.lcshFeedback (Psychology)en
dc.subject.lcshPerformanceen
dc.titleTask based performance feedback and subsequent worker performanceen
dc.typeDissertationen
dc.type.dcmitypeTexten
thesis.degree.disciplinePsychologyen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V856_1990.H343.pdf
Size:
3.95 MB
Format:
Adobe Portable Document Format