Case-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributes

dc.contributor.authorPishdad-Bozorgi, Pardisen
dc.contributor.committeechairBeliveau, Yvan J.en
dc.contributor.committeememberKu, Ki-hongen
dc.contributor.committeememberMcCoy, Andrew P.en
dc.contributor.committeememberGarvin, Michael J.en
dc.contributor.departmentBuilding Constructionen
dc.date.accessioned2017-04-06T15:43:08Zen
dc.date.adate2012-08-06en
dc.date.available2017-04-06T15:43:08Zen
dc.date.issued2012-07-06en
dc.date.rdate2016-10-17en
dc.date.sdate2012-07-21en
dc.description.abstractThe goal of this Ph.D. research is to explore the IPD contractual strategies, to highlight the elements that distinguish IPD from a traditional delivery approach, to analyze how trust-based relationships are established and promoted, and to demonstrate if/how trust and IPD contractual principles correlate. The result of this research will promote the understanding of the industry on the strategies that promote trust and integration through real world case studies. The significance of the subject becomes more evident when reflecting on the current industry's crisis: productivity loss, fragmented delivery process, and lack of trust and collaboration. Through a literature review a Project Delivery and Contracting Strategies (PDCS) framework, an IPD traits framework, and a trust-Building framework are developed. The frameworks are used as the organizational tools to structure and inquire relevant information on the two IPD projects. An expert panel is assembled to discuss the frameworks and the findings of literature analysis and to seek the industry's insight on the units of analysis for contract, and the units of measure for trust. The units of analysis for contract are elements, such as strategies for risks/rewards sharing, liability considerations, decision making authority, and governance. The units of measure for trust are the individuals' perception, and the trust-building attributes as outlined in table 4-1. Two IPD projects were selected and their contract agreements were studied. A questionnaire including both open-ended questions and multiple choice questions was developed based on the information collected through: 1. the IPD agreements in each case study, 2. the literature-based frameworks on trust and project delivery contracting strategies. Accordingly, two IPD case studies are developed following the analysis of their IPD agreements and the individual one-on-one interviews with their key IPD players. The trust-building framework presented in this work includes a series of techniques that the contracting parties can follow when establishing their contractual and managerial strategies and also when interacting with each other.en
dc.description.degreePh. D.en
dc.identifier.otheretd-07212012-003437en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-07212012-003437/en
dc.identifier.urihttp://hdl.handle.net/10919/77143en
dc.language.isoen_USen
dc.publisherVirginia Techen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectliabilitiesen
dc.subjecttasks assignmenten
dc.subjectrisks/rewards sharingen
dc.subjectrisk managementen
dc.subjectconstruction contractingen
dc.subjecttrust-building attributesen
dc.subjectIntegrated Project Delivery (IPD)en
dc.titleCase-based Study and Analysis of Integrated Project Delivery (IPD) Approach and Trust-Building Attributesen
dc.typeDissertationen
dc.type.dcmitypeTexten
thesis.degree.disciplineBuilding Constructionen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en

Files

Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
etd-07212012-003437_Pishdad-Bozorgi_P_D_2012.pdf
Size:
2.27 MB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
etd-07212012-003437_Pishdad-Bozorgi_P_IRB_2012.pdf
Size:
162.01 KB
Format:
Adobe Portable Document Format