Virginia Tech
    • Log in
    View Item 
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Framework of a Multi-Level Database of Highway Construction Performance Times

    Thumbnail
    View/Open
    RCW_Thesis.pdf (3.184Mb)
    Downloads: 301
    Date
    2006-04-28
    Author
    Williams, Robert Charles
    Metadata
    Show full item record
    Abstract
    Accurate and reasonable contract time is important to all aspects of a highway construction project. Unreasonably short contract times can raise the bid price, restrict qualified bidders from submitting bids, reduce the quality of the work, and increase the potential for legal disputes. Conversely, unreasonably long contract times encourage less qualified contractors to submit a bid and are a general inconvenience to the traveling public. The Federal Highway Administration (FHWA) recognizes this, and has recommended that all state highway agencies develop a standardized method for estimating contract performance time. To date, the Virginia Department of Transportation (VDOT) does not have an established method. One major portion of this work is the development of the framework for a multi-level time estimating system to aid in the establishment of contract performance times. This system parallels the VDOT cost estimating process, refining estimates as design details become available along the Project Development Concurrent Engineering Process (PDCEP). Three distinct stages exist along the PDCEP that will facilitate the use of a tool for estimating contract time. Sufficient information to begin the conceptual estimate is known as the project enters the six year plan. The parametric estimate may commence as the project enters the scoping phase. Finally, details for the pre-advertisement time estimate are available upon project field inspection. The second major component of this work, the pre-advertisement estimating database system (BIDDS – Bid Item Duration Data System) was constructed during this work. BIDDS uses project information and characteristics to filter through historical performance time data, returning production data from similar projects. Production data is returned at the bid item level to assist in the estimation of production rates, for calculating activity durations.
    URI
    http://hdl.handle.net/10919/32148
    Collections
    • Masters Theses [20800]

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us
     

     

    VTechWorks

    AboutPoliciesHelp

    Browse

    All of VTechWorksCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Log inRegister

    Statistics

    View Usage Statistics

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us