Virginia Tech
    • Log in
    View Item 
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    •   VTechWorks Home
    • ETDs: Virginia Tech Electronic Theses and Dissertations
    • Masters Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Design for Assembly Methods for Large and Heavy Plates: An experimental Design

    Thumbnail
    View/Open
    TITLE.PDF (150.1Kb)
    Downloads: 37
    Ch1.pdf (96.10Kb)
    Downloads: 174
    Ch2.pdf (165.1Kb)
    Downloads: 124
    Ch3.pdf (271.7Kb)
    Downloads: 14128
    Ch4.pdf (190.6Kb)
    Downloads: 63
    Ch5.pdf (129.4Kb)
    Downloads: 61
    Ch6.pdf (45.29Kb)
    Downloads: 22
    Ch7.pdf (64.12Kb)
    Downloads: 23
    Ch8.pdf (83.12Kb)
    Downloads: 28
    Appendix.pdf (195.1Kb)
    Downloads: 74
    Date
    2001-07-27
    Author
    Wongwanich, Yodyot
    Metadata
    Show full item record
    Abstract
    In spite of advances in industrial automation, manual assembly tasks continue to be an important feature of many industrial operations. In heavy part assembly, some pieces of raw material or equipment are too heavy to be safely handled by an operator. Material handling devices such as Jib cranes or overhead cranes are employed to help operators work safer and, in some cases, faster. However, during full-load productions, these devices could become limited and insufficient resources and hence, delay or extend the cycle times. Not only may the companies not be able to ship the products on time, but the labor and overhead costs also increase from the workers' increased idle time as they wait for a turn to use the devices. Finding a way to utilize the material handling devices more effectively could significantly reduce the total cycle times and production costs. An assembly task could be separated into three steps: transferring, approaching or positioning, and joining or fixing. The transferring time is principally dependent on the distance. The joining time could be directly reduced by increasing the efficiency of the joining machines. However, the positioning time depends on task difficulties, handling methods, and operators' skills. Therefore, this research focuses on how to specify the task difficulties and improve the efficiency of the handling methods. In this research, metal plates were used to represent heavy parts. Four handling methods were studied including One-person, Two-person team, One person with an overhead crane, and One person with a spring-equipped overhead crane. This study applies Fitts' Index of Difficulty as a guideline to determine task difficulty. The results indicate that, for all methods mentioned above, the relationships between moment time and task difficulty are linear. The results also show that, for a part that weights up to 40 pounds, a two-person team gives the fastest assembly time for every task difficulty. In addition, the assembly performance of one person with an overhead crane could be increased approximately 250% by adding a spring between the hook and the gripper.
    URI
    http://hdl.handle.net/10919/34370
    Collections
    • Masters Theses [20800]

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us
     

     

    VTechWorks

    AboutPoliciesHelp

    Browse

    All of VTechWorksCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Log inRegister

    Statistics

    View Usage Statistics

    If you believe that any material in VTechWorks should be removed, please see our policy and procedure for Requesting that Material be Amended or Removed. All takedown requests will be promptly acknowledged and investigated.

    Virginia Tech | University Libraries | Contact Us