An activity-based cost model for design-concurrent calculation

dc.contributor.authorWiegmann, Dirken
dc.contributor.departmentIndustrial and Systems Engineeringen
dc.date.accessioned2014-03-14T21:30:36Zen
dc.date.adate2009-03-03en
dc.date.available2014-03-14T21:30:36Zen
dc.date.issued1992en
dc.date.rdate2009-03-03en
dc.date.sdate2009-03-03en
dc.description.abstractThis research develops the concepts as well as a "case study” implementation of a cost model that estimates the costs of product design alternatives during the design process. This cost information, regarding design alternatives, is for decision making purposes. With the help of this cost model, the designer can better approximate that product form which results in the lowest costs of production, i.e., for which the sum of material costs and activity costs are minimized. The cost model integrates similarity analysis into an enhanced version of an activity-based cost management system. The similarity analysis is required because the details of a product's bill of materials and bill of activities are not yet available during the design process; however, such information provides the basis for any activity-based cost calculation. In a first step the cost model determines which of the existing products, based upon their cost driving characteristics, belong to the same product family as the design alternative. For these products detailed information is available, thus they can be used as reference products for the similarity analysis. These existing products are calculated as if they were the design alternative, hence they follow the decision costs principle; i.e., costs that will appear in the future but were determined in the past are not relevant for a particular decision. Subsequently, those reference products - as calculated on the basis of decision costs for the respective design - are utilized in a regression analysis. This analysis approximates the functional relationship between the product's cost driving characteristics and its costs, so that, finally, the costs for the design alternative in question can be estimated based on its characteristics.en
dc.description.degreeMaster of Scienceen
dc.format.extentxii, 124 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-03032009-040709en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-03032009-040709/en
dc.identifier.urihttp://hdl.handle.net/10919/41368en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V855_1992.W544.pdfen
dc.relation.isformatofOCLC# 26208604en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V855 1992.W544en
dc.subject.lcshIndustrial design -- Costsen
dc.titleAn activity-based cost model for design-concurrent calculationen
dc.typeThesisen
dc.type.dcmitypeTexten
thesis.degree.disciplineIndustrial and Systems Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V855_1992.W544.pdf
Size:
5.69 MB
Format:
Adobe Portable Document Format
Description:

Collections