Development of a resource scheduling model

dc.contributor.authorGintner, Mark G.en
dc.contributor.departmentComputer Scienceen
dc.date.accessioned2019-07-03T18:56:57Zen
dc.date.available2019-07-03T18:56:57Zen
dc.date.issued1986en
dc.description.abstractThe purpose of this study is to find models that best represent the software development process of IBM Federal Systems Division (FSD). The primary area of research is to evaluate existing effort estimating models and to develop a model best suited to IBM FSD's environment. The method of evaluation is an analysis of three existing models and their performance on a database of project information. The models used in this study included the Basic COCMO model by Boehm, the COPMO model by Thebaut and Putnam's macroestimating model. After extensive evaluation a hybrid effort estimating model was developed, and proven to be the best predictor of effort.en
dc.description.degreeM.S.en
dc.format.extentviii, 91 leavesen
dc.format.mimetypeapplication/pdfen
dc.identifier.urihttp://hdl.handle.net/10919/91100en
dc.language.isoen_USen
dc.publisherVirginia Polytechnic Institute and State Universityen
dc.relation.isformatofOCLC# 15123883en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V855 1986.G578en
dc.subject.lcshComputer service industryen
dc.titleDevelopment of a resource scheduling modelen
dc.typeThesisen
dc.type.dcmitypeTexten
thesis.degree.disciplineComputer Scienceen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameM.S.en

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V855_1986.G578.pdf
Size:
3.18 MB
Format:
Adobe Portable Document Format

Collections