A robust Shewhart control chart adjustment strategy

dc.contributor.authorZou, Xuelien
dc.contributor.committeechairNachlas, Joel A.en
dc.contributor.committeememberSherali, Hanifen
dc.contributor.committeememberKoelling, C. Patricken
dc.contributor.committeememberArnold, Jesse C.en
dc.contributor.committeememberBeaton, Robert J.en
dc.contributor.departmentIndustrial and Systems Engineeringen
dc.date.accessioned2014-03-14T21:13:48Zen
dc.date.adate2008-06-06en
dc.date.available2014-03-14T21:13:48Zen
dc.date.issued1993en
dc.date.rdate2008-06-06en
dc.date.sdate2008-06-06en
dc.description.abstractThe standard Shewhart control chart for monitoring process stability is generalized by selecting a point in time at which the distance between the control limits is reduced. Three cost models are developed to describe the total cost per unit time of monitoring the mean of a process using both the standard and the generalized Shewhart control chart. The cost models are developed under the assumption that the quality characteristic of interest is normally distributed with known and constant variance. In the development of the first model, the negative exponential distribution is employed to model the time to process shift. Then, the uniform distribution and the Weibull distribution are used for the same purpose in the second and the third model, respectively. The motivation for this effort is to increase chart sensitivity to small but anticipated shifts in the process average. Cost models are constructed to allow the optimal choice of change over time and the best values for the initial and adjusted control limit values. The cost models are analyzed to determine the optimal control chart parameters including those associated with both the standard and the generalized control chart. The models are also used to provide a comparison with conventional implementation of the control chart. It is shown that the proposed cost models are efficient and economical. Figures and tables are provided to aid in the design of models for both the standard and the generalized Shewhart control chart.en
dc.description.degreePh. D.en
dc.format.extentix, 168 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-06062008-164701en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-06062008-164701/en
dc.identifier.urihttp://hdl.handle.net/10919/38288en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V856_1993.Z68.pdfen
dc.relation.isformatofOCLC# 30658942en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V856 1993.Z68en
dc.subject.lcshQuality control -- Charts, diagrams, etcen
dc.titleA robust Shewhart control chart adjustment strategyen
dc.typeDissertationen
dc.type.dcmitypeTexten
thesis.degree.disciplineIndustrial and Systems Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.leveldoctoralen
thesis.degree.namePh. D.en

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V856_1993.Z68.pdf
Size:
5.4 MB
Format:
Adobe Portable Document Format
Description: