A method for setup time reduction in high precision machine cells

dc.contributor.authorSzatkowski, Paul Michaelen
dc.contributor.departmentIndustrial Engineering and Operations Researchen
dc.date.accessioned2014-03-14T21:35:48Zen
dc.date.adate2009-05-09en
dc.date.available2014-03-14T21:35:48Zen
dc.date.issued1990en
dc.date.rdate2009-05-09en
dc.date.sdate2009-05-09en
dc.description.abstractThis research focused on an important aspect of production, machine changeover, or setup time. Setup time is defined as the elapsed time between producing the last part from the most recent lot to the first part of an incoming lot. The research had four objectives. First, an existing method to reduce machine changeover time was evaluated in a high-precision machine cell (HPMC). Second, the causes and effects of setup problems in an HPMC were identified. Third, a method to reduce setup time was developed to more fully address some of the identified problems. Fourth, the developed method was evaluated in another HPMC. After reviewing published setup reduction methodologies, the Single Minute Exchange of Dies (SMED) approach was selected for evaluation in machine cells. According to its developer, SMED can typically reduce setup time by 70 to 90%. The case study did not fully support this claim. Possible explanations for the mixed results were developed. Also, a number of setup problems were not fully corrected. These problems included machine and tooling failures, delays from tasks not completed at the machine area, and labor-related problems. A method to reduce setup time was developed. The method applied the work simplification approach to reduce setup time. The developed setup reduction method consisted of five steps: (1) document the existing method, (2) simplify the current method while using the same tooling and procedures, (3) identify opportunities to reduce setup time, (4) prioritize the opportunities and (5) implement the prioritized projects. The method includes the basic setup reduction principles of SMED and addresses problems that were not fully corrected by SMED. The developed method was tested in another high-precision machine cell. An additional 22% reduction in setup time occurred as a result of correcting problems not fully addressed by SMED. It was concluded that because the new method focused on the manpower, materials, and methodology used during a changeover, it reduced setup time further than existing methods.en
dc.description.degreeMaster of Scienceen
dc.format.extentx, 196 leavesen
dc.format.mediumBTDen
dc.format.mimetypeapplication/pdfen
dc.identifier.otheretd-05092009-040558en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-05092009-040558/en
dc.identifier.urihttp://hdl.handle.net/10919/42556en
dc.language.isoenen
dc.publisherVirginia Techen
dc.relation.haspartLD5655.V855_1990.S938.pdfen
dc.relation.isformatofOCLC# 23745978en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V855 1990.S938en
dc.subject.lcshMachine shops -- Production standardsen
dc.subject.lcshTime measurementsen
dc.titleA method for setup time reduction in high precision machine cellsen
dc.typeThesisen
dc.type.dcmitypeTexten
thesis.degree.disciplineIndustrial Engineering and Operations Researchen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V855_1990.S938.pdf
Size:
13.41 MB
Format:
Adobe Portable Document Format
Description:

Collections