An Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractors

dc.contributor.authorKelleher, Andrew Hodgsonen
dc.contributor.committeechairde la Garza, Jesus M.en
dc.contributor.committeememberSonger, Anthony D.en
dc.contributor.committeememberVorster, Michael C.en
dc.contributor.departmentCivil Engineeringen
dc.date.accessioned2011-08-06T16:01:25Zen
dc.date.adate2004-05-06en
dc.date.available2011-08-06T16:01:25Zen
dc.date.issued2003-12-11en
dc.date.rdate2004-05-06en
dc.date.sdate2004-04-27en
dc.description.abstractThe Critical Path Method (CPM) is a widely used tool throughout the construction industry. Since its creation, the use and application of the Critical Path Method has grown tremendously. Up to date, three studies have been performed on how Engineering News Record's (ENR) Top 400 Contractor use CPM. The first study was performed by Edward Davis in 1974 and the second was performed by Amir Tavakoli and Roger Riachi in 1990. This paper is a summary of the third survey, which took place in 2003. The results from the three studies indicate that CPM use by the Top 400 Contractors is growing and the areas of use are expanding. The number one use of CPM throughout the years is detailed planning before the start of construction. Periodic control during construction is another large area of CPM use and has been a large area of growth due to the advances in technology, which make updating a schedule during construction easier and faster than was possible with a mainframe computer in the past. Another area of CPM growth is estimating and bidding for several reasons: use in this area has jumped from 19% to 54% in the past 30 years. An area of concern lately in CPM is the use of precedence diagramming instead of arrow diagramming. Despite the debate, the responding companies found precedence diagrams easier to read, provide more flexibility, and allow for easier use of "smart" relationships (i.e. start-start).en
dc.description.degreeMaster of Scienceen
dc.format.mediumETDen
dc.identifier.otheretd-04272004-233103en
dc.identifier.sourceurlhttp://scholar.lib.vt.edu/theses/available/etd-04272004-233103en
dc.identifier.urihttp://hdl.handle.net/10919/9889en
dc.publisherVirginia Techen
dc.relation.haspartThesis_Drew.pdfen
dc.relation.haspartIRB_approval.jpgen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectschedulingen
dc.subjectCPMen
dc.subjectENR Top 400en
dc.titleAn Investigation of the Expanding Role of the Critical Path Method by ENR'S Top 400 Contractorsen
dc.typeThesisen
thesis.degree.disciplineCivil Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Thesis_Drew.pdf
Size:
484.6 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
IRB_approval.jpg
Size:
847.52 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)

Collections