Construction and operation of the VPI & SU high-speed turbomachinery test facility

dc.contributor.authorJones, Ralph Raymonden
dc.contributor.departmentMechanical Engineeringen
dc.date.accessioned2024-12-02T18:09:55Zen
dc.date.available2024-12-02T18:09:55Zen
dc.date.issued1975en
dc.description.abstractWork related to the continued development of the VPI&SU highspeed turbomachinery test facility is reported. Fuel, lubrication and hydraulic systems have been designed to meet the requirements of the drive engine (a free power turbine gas turbine engine) and the test compressor. An overspeed system for monitoring and control of the engine's free power turbine speed has been designed and successfully tested and operating procedures for the test cell systems were established. A vibration analysis was conducted to check for torsional resonances within the operating ranges of several drive train configurations. Also, a noise control system has been proposed to deal with noise levels generated during testing.en
dc.description.degreeM.S.en
dc.format.extentix, 121 leavesen
dc.format.mimetypeapplication/pdfen
dc.identifier.urihttps://hdl.handle.net/10919/123685en
dc.language.isoenen
dc.publisherVirginia Polytechnic Institute and State Universityen
dc.relation.isformatofOCLC# 20836376en
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subject.lccLD5655.V855 1975.J647en
dc.subject.lcshTurbomachines -- Performanceen
dc.titleConstruction and operation of the VPI & SU high-speed turbomachinery test facilityen
dc.typeThesisen
dc.type.dcmitypeTexten
thesis.degree.disciplineMechanical Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameM.S.en

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
LD5655.V855_1975.J647.pdf
Size:
7.63 MB
Format:
Adobe Portable Document Format

Collections