Agent-based Modeling for Recovery Planning after Hurricane Sandy

dc.contributor.authorHajhashemi, Elhamen
dc.contributor.committeechairHotle, Susanen
dc.contributor.committeechairMurray-Tuite, Pamela Marieen
dc.contributor.committeememberHancock, Kathleen L.en
dc.contributor.committeememberHeaslip, Kevin Patricken
dc.contributor.departmentCivil and Environmental Engineeringen
dc.date.accessioned2018-09-14T08:00:19Zen
dc.date.available2018-09-14T08:00:19Zen
dc.date.issued2018-09-13en
dc.description.abstractHurricane Sandy hit New York City on October 29, 2012 and greatly disrupted transportation systems, power systems, work, and schools. This research used survey data from 397 respondents in the NYC Metropolitan Area to develop an agent-based model for capturing commuter behavior and adaptation after the disruption. Six different recovery scenarios were tested to find which systems are more critical to recover first to promote a faster return to productivity. Important factors in the restoration timelines depends on the normal commuting pattern of people in that area. In the NYC Metropolitan Area, transit is one of the common modes of transportation; therefore, it was found that the subway/rail system recovery is the top factor in returning to productivity. When the subway/rail system recovers earlier (with the associated power), more people are able to travel to work and be productive. The second important factor is school and daycare closure (with the associated power and water systems). Parents cannot travel unless they can find a caregiver for their children, even if the transportation system is functional. Therefore, policy makers should consider daycare and school condition as one of the important factors in recovery planning. The next most effective scenario is power restoration. Telework is a good substitute for the physical movement of people to work. By teleworking, people are productive while they skip using the disrupted transportation system. To telework, people need power and communication systems. Therefore, accelerating power restoration and encouraging companies to let their employees' telework can promote a faster return to productivity. Finally, the restoration of major crossings like bridges and tunnels is effective in the recovery process.en
dc.description.abstractgeneralNatural and man-made disasters, cause massive destruction of property annually and disrupt the normal economic productivity of an area. Although the occurrence of these disasters cannot be controlled, society can minimize the effects with post-disaster recovery strategies. Hurricane Sandy hit New York City on October 29, 2012 and greatly disrupted transportation systems, power systems, work, and schools. In this research, commuter behavior and adaptation after the hurricane were captured by using a survey data that asked questions from people living in NYC metropolitan area about their commuting behavior before and after Hurricane Sandy. An agent-based model was developed and six different recovery strategies were tested in order to find effective factors in returning people to normal productive life faster. In the NYC Metropolitan Area, transit is one of the common modes of transportation; therefore, it was found that the subway/rail system recovery is the top factor in returning to productivity. The next important factor is school and daycare closure. Parents are responsible for their children, therefore; they may not travel to work when school and daycares are closed. The third important factor is power restoration. To telework, people need power and communication systems. By teleworking, people are productive while they skip using the disrupted transportation system. The final important factor is the restoration of major crossings like bridges and tunnels.en
dc.description.degreeMaster of Scienceen
dc.format.mediumETDen
dc.identifier.othervt_gsexam:16984en
dc.identifier.urihttp://hdl.handle.net/10919/85012en
dc.publisherVirginia Techen
dc.rightsIn Copyrighten
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en
dc.subjectAgent-based modelingen
dc.subjecthurricane Sandyen
dc.subjectadaptationen
dc.titleAgent-based Modeling for Recovery Planning after Hurricane Sandyen
dc.typeThesisen
thesis.degree.disciplineCivil Engineeringen
thesis.degree.grantorVirginia Polytechnic Institute and State Universityen
thesis.degree.levelmastersen
thesis.degree.nameMaster of Scienceen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Hajhashemi_E_T_2018.pdf
Size:
1.52 MB
Format:
Adobe Portable Document Format

Collections