Hybrid flow shop scheduling with prescription constraints on jobs
dc.contributor.author | Simonneau, Nicolas | en |
dc.contributor.committeechair | Shewchuk, John P. | en |
dc.contributor.committeecochair | Dauzere-Peres, Stephane | en |
dc.contributor.committeemember | Deisenroth, Michael P. | en |
dc.contributor.department | Industrial and Systems Engineering | en |
dc.date.accessioned | 2011-08-06T14:44:47Z | en |
dc.date.adate | 2004-01-08 | en |
dc.date.available | 2011-08-06T14:44:47Z | en |
dc.date.issued | 2003-12-05 | en |
dc.date.rdate | 2005-01-08 | en |
dc.date.sdate | 2003-12-15 | en |
dc.description.abstract | The sponsor of the thesis is the Composite Unit of AIRBUS Nantes plant, which manufactures aircraft composite. The basic process to manufacture composite parts is to lay-up raw composite material on a tool and involves very costly means and raw material. This process can be modeled as a two-stage hybrid flow shop problem with specific constraints, particularly prescription constraints on the jobs. This thesis restates the practical problem as a scheduling problem by doing hypotheses and restrictions. Then, it designs a mathematical model based on time-indexed variables. This model has been implemented in an IP solver to solve real based scenarios. A heuristic algorithm is developed for obtaining good solutions quickly. Finally, the heuristic is used to increase the execution speed of the IP solver. This thesis concludes by a discussion on the advantages and disadvantages of each option (IP solver vs. heuristic software) for the sponsor. | en |
dc.description.degree | Master of Science | en |
dc.format.medium | ETD | en |
dc.identifier.other | etd-12152003-130453 | en |
dc.identifier.sourceurl | http://scholar.lib.vt.edu/theses/available/etd-12152003-130453 | en |
dc.identifier.uri | http://hdl.handle.net/10919/9659 | en |
dc.publisher | Virginia Tech | en |
dc.relation.haspart | ETDSimonneau_v2.pdf | en |
dc.rights | In Copyright | en |
dc.rights.uri | http://rightsstatements.org/vocab/InC/1.0/ | en |
dc.subject | Aerospace Industry | en |
dc.subject | Heuristic Software | en |
dc.subject | Optimization | en |
dc.subject | Integer Programming Software | en |
dc.subject | Prescription Constraints | en |
dc.subject | Two-stage Hybrid Flow Shop | en |
dc.title | Hybrid flow shop scheduling with prescription constraints on jobs | en |
dc.type | Thesis | en |
thesis.degree.discipline | Industrial and Systems Engineering | en |
thesis.degree.grantor | Virginia Polytechnic Institute and State University | en |
thesis.degree.level | masters | en |
thesis.degree.name | Master of Science | en |
Files
Original bundle
1 - 1 of 1